<
project centre
project centre

 

 

For this project you will need:

Measuring Tape Stud Finder
Mitre Saw Nail Gun
16g or 18g Finishing Nails Level
Appropriate Safety equipment Pencil/Marking Tool

 

 

Step 1

Measure your wall and determine how much product you will need. Make sure your base floor trim is installed. Using a stud finder, mark out where your studs are on the wall. Familiarize yourself with how the shiplap boards connect and lock into place.

 

Step 2

Begin by placing your first board on top of the trim ensuring that it is level. Attach the boards to the wall where the marked studs are.

 

Step 3

Set and lock the boards into each other while staggering your seams as you move up the wall. When you're able to, try and nail into the seams to eliminate nail holes on front panel.

 

Step 4

Once the wall is complete, fill and sand any nail holes. Caulk the edges and paint.

 

Shop Shiplap